M-001 Dual Channel Serial Injection - Analyst with ICC-CE
From LEAP
(Difference between revisions)
Line 26: | Line 26: | ||
[[Image:Table M-001.png]] | [[Image:Table M-001.png]] | ||
- | [[Column_Regeneration.pps]] | + | *[[:Column_Regeneration.pps| Valve Power Point]] |
+ | |||
Revision as of 20:40, 27 February 2009
LC Column Switching & Regeneration | |
Application Type | |
SPECIAL | |
Application ID | |
M-001 | |
Description | |
LC Column Switching & Regeneration. |
Overview
This configuration allows the regeneration of one of the analytical columns while the other one is engaged - giving greater efficiency and higher throughput. This can be run directly from within Analyst using a custom Cycle (requires ICC-CE).
There are 2 pumps needed, one for the gradient run and another (higher flow rate and isocratic) for regeneration. This configuration requires a 6 port valve for sample loading and a 10 port valve for column switching.
Both valves must be controlled by the custom cycle. LEAP can not control the MS Selector valve as part of the cycle.
Contact LEAP
Keyword: Analyst Software, ICC-CE, PAL, 10 port valve, selector valve, injector valve, gradient pump, regeneration pump,back cut, peaks of interest, GLP